HVAC Systems & Vent Automation
Installation of air handling networks, chiller and boiler automation, and strict temperature/humidity control loop integrations.
Installation of Industrial Ventilation Equipment
Installing ducts and ventilation units at industrial facilities is performed according to design documents. Specialists mount air ducts, filter units, heaters, and fans. Ventilation equipment layouts are planned based on drawings of engineering infrastructure. Control valves are installed on the ducts. Silencers and dampers are mounted at specific points to control noise and air velocity. We verify that duct support brackets are securely anchored to building structures.
- Mounting ventilation units and fans.
- Laying air distribution duct networks.
- Installing water and electric heater coils.
Automation of HVAC Systems
Automating HVAC equipment provides climate parameter control without manual intervention. HVAC control panels include controllers, temperature sensors, and actuator drives. Automatic control protects water coils from freezing in winter. Power supply for panels is provided by related electrical installation works. Controllers use PID algorithms to adjust heating output, maintaining stable room temperatures. Outdoor temperature sensors are used to calculate heating compensations automatically.
- Mounting sensors for temperature and humidity.
- Installing HVAC control panels at sites.
- Configuring actuator drives for air dampers.
Integration of Climate Control with Dispatching
Connecting HVAC panels to dispatch systems enables centralized monitoring of climate parameters. Temperature and fan state data are sent to the operator console. This allows tracking warnings. Maintaining system operation requires regular maintenance of automation equipment. The system logs filter pressure drops, alerting technicians when filter replacements are due. This integration reduces the need for physical checks in remote ventilation plantrooms.
- Configuring data transmission to dispatch rooms.
- Setting up alarm parameters for HVAC units.
- Testing panel communication with SCADA networks.
Verification of Installed HVAC Equipment
After mounting, HVAC equipment undergoes verification of actuator operation. Specialists check damper movements when signals are applied. Verification of installed HVAC equipment includes checking fan rotation direction and checking duct joints for tightness before starting the system. Technicians measure static pressures and motor currents to verify they align with design curves. All dampers are checked for tight shut-off.
- Checking fan motor rotation direction.
- Checking air duct joint sealing.
- Preparing verification reports for HVAC units.
APS Engineering has operated in Kazakhstan since 2009 and delivers industrial projects in the oil refining, gas, chemical, pharmaceutical, mining, and energy sectors. Its projects use solutions from Siemens, ABB, Schneider Electric, Emerson, Yokogawa, Honeywell, and other industrial automation manufacturers.
Related Projects
Aromatic Hydrocarbon Production Complex — HVAC Automation
Aromatic hydrocarbon production complex. Design, supply, installation, and commissioning of a microprocessor-based heating and ventilation system built on the Yokogawa Centum CS 3000 controller platform.
SKS3 Compressor Station — HVAC Systems
Supply, installation, and commissioning of ventilation and air conditioning systems at the SKS3 compressor station and the associated rotational camp facilities.
Amur Gas and Chemical Complex — Electrical & Safety Systems
Construction of the Amur Gas and Chemical Complex. Supply, installation, and commissioning of power supply, lighting, HVAC, fire alarm, notification, evacuation, and fire suppression systems.
Service Sectors
Request a Consultation
Contact APS engineers to discuss the technical requirements of your facility. We will design an optimal engineering solution.
Send InquiryFAQ
Frequently Asked Questions
What initial data is required for HVAC system works?
Can existing climate equipment be integrated into the system?
How is the scope of HVAC automation determined?
What documentation is provided after HVAC installation?
Get In Touch
Contact Us
Have an upcoming project or engineering inquiry? Reach out to our specialist engineers in Almaty today.
Alternative Power System
Full-Cycle Engineering Company
Address
Republic of Kazakhstan, Almaty, Nazarbayev Ave. 175, office 300
Phone
+7 727 267 09 08Working hours
Mon–Fri, 09:00–18:00