Power Supply Systems
Design, engineering, and integration of reliable power supply systems for industrial facilities and corporate clients.
Power Supply System Engineering
Designing power distribution systems requires careful estimation of operational loads, safety codes, and future expansion requirements. Our team designs technical solutions for stable electrical power distribution.
- Electrical load calculations and power balance modeling.
- Designing single-line diagrams for distribution networks.
- Planning routing for internal and external power cabling.
Power Distribution Infrastructure
Modern electrical systems in plants require a complex integration of machinery. We support the implementation and adjustment of crucial components:
- Main distribution boards (MDB) and switchgear units.
- Power factor correction (PFC) cabinets to improve grid efficiency.
- Automatic transfer switches (ATS) and emergency generator control boards.
Grid Safety and Operational Stability
A professionally designed power supply system minimizes the risk of production blackouts and expensive equipment damage. We align all electrical documentation with Kazakhstan technical standards for commission approvals.
Related Projects
Almaty Metro — Line 1, Phase 2, Third Launch Complex
Construction of the third launch complex of the second phase of the first line of the Almaty metro. Installation of the automated control system (ACS) and automated dispatch control system (ADCS) for controlling the metro's power supply, lighting, and electromechanical devices.
SCADA Data Integration — Schneider Electric
Removal and transmission of data from distribution cells to the SCADA system using Schneider Electric equipment. Ensuring seamless real-time data exchange across the pipeline infrastructure.
AGRS Arshaly — SCADA Modernization
Modernization of the SCADA system of the Arshaly automated gas distribution station (AGRS), including integration into the existing SCADA infrastructure of the Astana administrative district.
AGRS Kirpichny — SCADA Modernization
Modernization of the SCADA system of the Kirpichny automated gas distribution station (AGRS), including integration into the existing SCADA infrastructure of the Astana administrative district.
Amur Gas and Chemical Complex — Electrical & Safety Systems
Construction of the Amur Gas and Chemical Complex. Supply, installation, and commissioning of power supply, lighting, HVAC, fire alarm, notification, evacuation, and fire suppression systems.
Boiler House Reconstruction — Biomass & Coal Boilers
Boiler house reconstruction with installation of two E-14-1.4 OKI steam boilers designed for burning sunflower husks and coal. Supply, construction, and commissioning of power supply and automated control systems with dispatching capabilities.
Service Sectors
Request a Consultation
Contact APS engineers to discuss the technical requirements of your facility. We will design an optimal engineering solution.
Send InquiryFAQ
Frequently Asked Questions
Do you design both internal and external power systems?
Do you help select energy-efficient equipment?
What documentation is delivered at the end of the project?
Get In Touch
Contact Us
Have an upcoming project or engineering inquiry? Reach out to our specialist engineers in Almaty today.
Alternative Power System
Full-Cycle Engineering Company
Address
Republic of Kazakhstan, Almaty, Nazarbayev Ave. 175, office 300
Phone
+7 727 267 09 08Working hours
Mon–Fri, 09:00–18:00