Electrical Installation

Safe and professional installation of electrical systems, power distribution boards, and industrial cabling infrastructure.

Installation of Industrial Electrical Equipment

The installation of power and distribution electrical equipment at industrial and commercial sites is performed based on approved design documentation. All activities are carried out in compliance with safety rules and labor protection regulations. Installation teams mount distribution boards, power units, and grounding systems. Quality preparation of the site also includes connecting control cabinets and automation units. Installers verify that all electrical enclosures are positioned correctly according to site layout plans.

  • Mounting power panels and distribution boards.
  • Installing protective grounding loops at sites.
  • Mounting lightning protection systems for buildings.

Cable Infrastructure and Route Installation

Power and control cables are installed along prepared routes using metal cable trays, conduits, and protective corrugated hoses. The choice of specific laying methods depends on environmental conditions in production areas. Installation teams lay cables of various cross-sections, mark the lines, and prepare them for connection. Proper cable bend radiuses are observed to prevent internal stress on conductors.

  • Mounting cable trays, conduits, and brackets.
  • Laying power and control cable lines.
  • Marking and arranging cables in channels.

Connection of Power Distribution Equipment

Connecting power distribution equipment includes mounting switching devices, busbar systems, and terminating cable ends. This is a critical stage in building the overall power supply system of the facility. Installers secure reliable electrical contacts in terminals and ensure correct load distribution across phases in accordance with single-line diagrams. Torque wrenches are used to tighten terminal screws according to manufacturer recommendations.

  • Connecting incoming and outgoing cable lines.
  • Mounting switching devices and copper busbars.
  • Terminating and crimping cable cores.

Verification Against Project Documentation

The final stage of installation works is checking all connections against the design drawings. Installers verify marking correctness, the grounding of metal enclosures, and the integrity of cable insulation. All activities are coordinated with the installation of adjacent engineering systems at the enterprise. Based on checking results, necessary testing reports are compiled. These check sheets document that the physical installation conforms to technical regulations.

  • Visual inspection of completed connections.
  • Checking the integrity of grounding conductors.
  • Preparing hand-over protocols and reports.

APS has operated in Kazakhstan since 2009 and delivers industrial projects in the oil refining, gas, chemical, pharmaceutical, mining, and energy sectors. Its projects use solutions from Siemens, ABB, Schneider Electric, Emerson, Yokogawa, Honeywell, and other industrial automation manufacturers.

Related Projects

Chemical Industry
Sibur Amur Gas and Chemical Complex LLC2022

Amur Gas and Chemical Complex — Electrical & Safety Systems

Construction of the Amur Gas and Chemical Complex. Supply, installation, and commissioning of power supply, lighting, HVAC, fire alarm, notification, evacuation, and fire suppression systems.

CompletedDETAILS
Gas Transportation Systems
InterGas Central Asia JSC2019–2021

Sary-Arka Gas Pipeline — Full-Cycle I&C and SCADA

Comprehensive supply, installation, and commissioning of instrumentation and automation equipment, process control systems (PCS), automation cabinets, and SCADA systems for the Sary-Arka gas pipeline, including implementation in dispatch and control centers.

CompletedDETAILS
Energy & Utilities
Akimat of Ekibastuz2023

Heat Main TM-II Reconstruction — Automation & Dispatching

Reconstruction of heat main TM-II from thermal chamber TK-19L to TK-24L and from TK-24L to central heat point TsTP-52. Supply, construction, and commissioning of instrumentation and automation equipment and process control cabinets for automation and dispatching systems.

CompletedDETAILS
Gas Transportation Systems
Asian Gas Pipeline LLP2017–2018

SKS5 Compressor Station — I&C and Fiber-Optic Lines

Supply, installation, and commissioning of instrumentation and control (I&C) equipment and fiber-optic communication lines (FOCL) at the SKS5 compressor station.

CompletedDETAILS

FAQ

Frequently Asked Questions

What is included in electrical installation works?
Laying power and control cables, mounting trays, installing distribution boards, and connecting grounding networks.
What documents are needed before starting electrical installation?
Approved drawings, layout plans, equipment manuals, and material specifications are required.
Can existing cable trays and pathways be utilized?
Yes, using existing trays is possible if their capacity and load ratings meet project specifications.
How is the quality of electrical installation verified?
Works undergo visual check, insulation checks, and connection verification according to the design package.

Get In Touch

Contact Us

Have an upcoming project or engineering inquiry? Reach out to our specialist engineers in Almaty today.

Alternative Power System

Full-Cycle Engineering Company

Address

Republic of Kazakhstan, Almaty, Nazarbayev Ave. 175, office 300

Working hours

Mon–Fri, 09:00–18:00