Electrical Installation
Safe and professional installation of electrical systems, power distribution boards, and industrial cabling infrastructure.
Installation of Industrial Electrical Equipment
The installation of power and distribution electrical equipment at industrial and commercial sites is performed based on approved design documentation. All activities are carried out in compliance with safety rules and labor protection regulations. Installation teams mount distribution boards, power units, and grounding systems. Quality preparation of the site also includes connecting control cabinets and automation units. Installers verify that all electrical enclosures are positioned correctly according to site layout plans.
- Mounting power panels and distribution boards.
- Installing protective grounding loops at sites.
- Mounting lightning protection systems for buildings.
Cable Infrastructure and Route Installation
Power and control cables are installed along prepared routes using metal cable trays, conduits, and protective corrugated hoses. The choice of specific laying methods depends on environmental conditions in production areas. Installation teams lay cables of various cross-sections, mark the lines, and prepare them for connection. Proper cable bend radiuses are observed to prevent internal stress on conductors.
- Mounting cable trays, conduits, and brackets.
- Laying power and control cable lines.
- Marking and arranging cables in channels.
Connection of Power Distribution Equipment
Connecting power distribution equipment includes mounting switching devices, busbar systems, and terminating cable ends. This is a critical stage in building the overall power supply system of the facility. Installers secure reliable electrical contacts in terminals and ensure correct load distribution across phases in accordance with single-line diagrams. Torque wrenches are used to tighten terminal screws according to manufacturer recommendations.
- Connecting incoming and outgoing cable lines.
- Mounting switching devices and copper busbars.
- Terminating and crimping cable cores.
Verification Against Project Documentation
The final stage of installation works is checking all connections against the design drawings. Installers verify marking correctness, the grounding of metal enclosures, and the integrity of cable insulation. All activities are coordinated with the installation of adjacent engineering systems at the enterprise. Based on checking results, necessary testing reports are compiled. These check sheets document that the physical installation conforms to technical regulations.
- Visual inspection of completed connections.
- Checking the integrity of grounding conductors.
- Preparing hand-over protocols and reports.
APS has operated in Kazakhstan since 2009 and delivers industrial projects in the oil refining, gas, chemical, pharmaceutical, mining, and energy sectors. Its projects use solutions from Siemens, ABB, Schneider Electric, Emerson, Yokogawa, Honeywell, and other industrial automation manufacturers.
Related Projects
Amur Gas and Chemical Complex — Electrical & Safety Systems
Construction of the Amur Gas and Chemical Complex. Supply, installation, and commissioning of power supply, lighting, HVAC, fire alarm, notification, evacuation, and fire suppression systems.
Sary-Arka Gas Pipeline — Full-Cycle I&C and SCADA
Comprehensive supply, installation, and commissioning of instrumentation and automation equipment, process control systems (PCS), automation cabinets, and SCADA systems for the Sary-Arka gas pipeline, including implementation in dispatch and control centers.
Heat Main TM-II Reconstruction — Automation & Dispatching
Reconstruction of heat main TM-II from thermal chamber TK-19L to TK-24L and from TK-24L to central heat point TsTP-52. Supply, construction, and commissioning of instrumentation and automation equipment and process control cabinets for automation and dispatching systems.
SKS5 Compressor Station — I&C and Fiber-Optic Lines
Supply, installation, and commissioning of instrumentation and control (I&C) equipment and fiber-optic communication lines (FOCL) at the SKS5 compressor station.
Service Sectors
Request a Consultation
Contact APS engineers to discuss the technical requirements of your facility. We will design an optimal engineering solution.
Send InquiryFAQ
Frequently Asked Questions
What is included in electrical installation works?
What documents are needed before starting electrical installation?
Can existing cable trays and pathways be utilized?
How is the quality of electrical installation verified?
Get In Touch
Contact Us
Have an upcoming project or engineering inquiry? Reach out to our specialist engineers in Almaty today.