SKS5 Compressor Station — I&C and Fiber-Optic Lines

Client: Asian Gas Pipeline LLP

Project Description

Supply, installation, and commissioning of instrumentation and control (I&C) equipment and fiber-optic communication lines (FOCL) at the SKS5 compressor station.

Scope of Services

  • Instrumentation and control equipment supply
  • Fiber-optic communication line installation
  • Equipment commissioning
  • System integration and testing

Related Projects

Gas Transportation Systems
Caspian Pipeline Consortium2015–2016

NPS-4 & NPS-3A Instrumentation and Control

Supply and commissioning of instrumentation and control (I&C) equipment at oil pumping stations NPS-4 and NPS-3A, including adjustment and fine-tuning of main pumps.

CompletedDETAILS
Gas Transportation Systems
Asian Gas Pipeline LLP2015–2017

SCADA Data Integration — Schneider Electric

Removal and transmission of data from distribution cells to the SCADA system using Schneider Electric equipment. Ensuring seamless real-time data exchange across the pipeline infrastructure.

CompletedDETAILS
Gas Transportation Systems
Asian Gas Pipeline LLP2016–2017

SKS3 Compressor Station — HVAC Systems

Supply, installation, and commissioning of ventilation and air conditioning systems at the SKS3 compressor station and the associated rotational camp facilities.

CompletedDETAILS

Project Details

Client
Asian Gas Pipeline LLP
Category
Gas Transportation Systems
Execution Period
2017–2018
Status
Completed

Request a Consultation

Contact APS engineers to discuss the technical requirements of your facility. We will design an optimal engineering solution.

Send Inquiry

Get In Touch

Contact Us

Have an upcoming project or engineering inquiry? Reach out to our specialist engineers in Almaty today.

Alternative Power System

Full-Cycle Engineering Company

Address

Republic of Kazakhstan, Almaty, Nazarbayev Ave. 175, office 300

Working hours

Mon–Fri, 09:00–18:00